What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Poland – „Odnawialne źródła energii na terenie Gminy Aleksandrów”
TED Gmina Aleksandrów
Procedure concluded
Awarded — contract award notice
Award amount
••••••
Result announced
24.09.2026
Contractors awarded the contract: 2
••••••••••••••
To see who was awarded the contract, create a free account. Create a free account →
COUNTRYPOLSKA
AWARD AMOUNT••••••
PUBLISHED24.09.2026
INDUSTRYIndustrial machinery
SUBJECT OF THE CONTRACT
The subject of the contract is the design, delivery, installation, and commissioning of photovoltaic systems (195 units with a total capacity of 1038.60 kW) and energy storage systems (190 units with a total capacity of 950 kWh) in the Gmina Brzeziny area. The investment is carried out under a 'design and build' system. The Contractor is required to prepare design documentation, obtain necessary permits, and perform…
This is the beginning of the description. The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Industrial machinery) bids can still be submitted in 12 procedures — deadlines within 14 days.
This buyer in the last 12 months
Gmina Aleksandrów: 20 notices.
Most frequent winners: Piotr Kołodziejczyk REM-BUD (2), ZAKŁAD BUDOWLANO-DROGOWY "DUKT" SPÓŁKA … (2), BUD-AN Sp. z o.o. (1).
Most frequent winners: Piotr Kołodziejczyk REM-BUD (2), ZAKŁAD BUDOWLANO-DROGOWY "DUKT" SPÓŁKA … (2), BUD-AN Sp. z o.o. (1).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Create a free account — see who was awarded the contract and for how much
Freemium account: 4 full cards to start · no credit card required