What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Poland – Pipes – Delivery of membrane wall panels for the EP650 boiler for ENEA Elektrownia Połaniec Sp. z o.o.
TED Enea Elektrownia Połaniec sp. z o.o.
COUNTRYPOLSKA
SUBMISSION DEADLINE16.10.2026
PUBLISHED05.10.2026
INDUSTRYConstruction materials
SUBJECT OF THE CONTRACT
Zamawiający wykluczy Wykonawcę zgodnie z art. 108 ust 1 oraz 109 ust 1 pkt 1, pkt 2, pkt 3 i pkt 4 Ustawy z zastrzeżeniem sytuacji, o której mowa w art. 393 ust. 4 Ustawy, tj. za wyjątkiem art. 108 ust. 1 pkt 1 lit. h Ustawy oraz w przypadku, o którym mowa w art. 108 ust. 1 pkt 2 Ustawy jeżeli osoba, o której mowa w tym przepisie została skazana za przestępstwo wymienione w art. 108 ust. 1 pkt 1 lit. h) Ustawy, na…
This is the beginning of the description. The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Construction materials) bids can still be submitted in 19 procedures — deadlines within 14 days.
This buyer in the last 12 months
Enea Elektrownia Połaniec sp. z o.o.: 28 notices.
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Register for free to win this tender
Freemium account: 4 full cards to start · no credit card required