What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Poland – Construction supervision services – Providing supervision for the design and execution of works on railway line no. 68 on the Stalowa Wola Rozwadów – Przeworsk section, including author's supervision as part of the project entitled: Works on railway line no. 68 on the Stalowa Wola Rozwadów – Przeworsk section - stage I
TED PKP Polskie Linie Kolejowe S.A.
COUNTRYPOLSKA
SUBMISSION DEADLINE14.10.2026
PUBLISHED25.09.2026
INDUSTRYArchitectural, engineering services
SUBJECT OF THE CONTRACT
[1] W zakresie warunku określonego w punkcie 8.2.2. IDW wymagane jest wykazanie przez Wykonawcę wykonania, w okresie ostatnich 10 lat przed upływem terminu składania ofert (a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie), co najmniej 1 (jednej) usługi polegającej na zarządzaniu inwestycją i sprawowaniu nadzoru nad realizacja robót budowlanych, z wyłączeniem nadzoru w okresie gwarancji, w…
This is the beginning of the description. The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
See similar tenders — Architectural, engineering services →
All tenders: PKP Polskie Linie Kolejowe S.A. →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Architectural, engineering services) bids can still be submitted in 66 procedures — deadlines within 14 days.
This buyer in the last 12 months
PKP Polskie Linie Kolejowe S.A.: 742 notices.
Most frequent winners: TORPOL S.A. (4), Trakcja S.A. (4), INTOP S.A. (3).
Most frequent winners: TORPOL S.A. (4), Trakcja S.A. (4), INTOP S.A. (3).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Register for free to win this tender
Freemium account: 4 full cards to start · no credit card required