What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
ROZBUDOWA DROGI GMINNEJ NR 162430E - UL. WSCHODNIEJ W PIOTRKOWIE TRYB. POLEGAJĄCA NA PRZEBUDOWIE JEZDNI, ZJAZDÓW, BUDOWIE CHODNIKA I KAN. DESZCZ. BUDOWA SIECI WOD. ORAZ KAN. SAN. WRAZ Z PRZYŁĄCZAMI.
BZP Zarząd Dróg i Utrzymania Miasta
Procedure concluded
Awarded — contract award notice
Award amount
••••••
Result announced
21.10.2026
Contractor awarded the contract
••••••••••••••
To see who was awarded the contract, create a free account. Create a free account →
COUNTRYPOLSKA
AWARD AMOUNT••••••
PUBLISHED21.10.2026
INDUSTRYConstruction work
SUBJECT OF THE CONTRACT
The subject of the contract is the execution of construction works regarding the reconstruction of road infrastructure in accordance with the design documentation and the Technical Specifications for Execution and Acceptance of Construction Works (STWiORB). The scope of work includes earthworks, sub-bases, asphalt concrete surfaces, and finishing works. The investment is being implemented based on the attached…
This is the beginning of the description. The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Construction work) bids can still be submitted in 1 192 procedures — deadlines within 14 days.
This buyer in the last 12 months
Zarząd Dróg i Utrzymania Miasta: 48 notices.
Most frequent winners: SATMAR MARCIN KUDYBA (2), DARIUSZ SOBIERSKI P.U. "ZiOM" S.C. (1), LIDER KONSORCJUM PRZEDSIĘBIORSTWO ROBÓT… (1).
Most frequent winners: SATMAR MARCIN KUDYBA (2), DARIUSZ SOBIERSKI P.U. "ZiOM" S.C. (1), LIDER KONSORCJUM PRZEDSIĘBIORSTWO ROBÓT… (1).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Create a free account — see who was awarded the contract and for how much
Freemium account: 4 full cards to start · no credit card required