What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Preparation of design documentation for the task entitled: Expansion and reconstruction of the building at 1a Potockiego Street in Żnin (plot no. 1048/4) to include a U-1 shelter
BZP Gmina Żnin
COUNTRYPOLSKA
SUBMISSION DEADLINE22.09.2026
PUBLISHED11.09.2026
INDUSTRYArchitectural, engineering services
SUBJECT OF THE CONTRACT
Preparation of complete design and cost estimate documentation for the extension and reconstruction of the building at 1A Potockiego St. in Żnin to include a U-1 shelter, including the provision of author's supervision.
The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Architectural, engineering services) bids can still be submitted in 220 procedures — deadlines within 14 days.
This buyer in the last 12 months
Gmina Żnin: 55 notices.
Most frequent winners: Szmigiel Znak Przemysław Szmigiel (2), Szmigiel Znaki Przemysław Szmigiel (2), ,,DOM – BRUK” DOMAGAŁA PAWEŁ (1).
Most frequent winners: Szmigiel Znak Przemysław Szmigiel (2), Szmigiel Znaki Przemysław Szmigiel (2), ,,DOM – BRUK” DOMAGAŁA PAWEŁ (1).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
The deadline for submitting tenders has passed — catch similar tenders before they expire
Free alerts for new procurement procedures in your industry · no credit card required