What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Wymiana nawierzchni boiska sztucznego B2 na Stadionie Miejskim im. Kazimierza Górskiego przy ul. Łukasiewicza 34 w Płocku
BZP Miejski Ośrodek Sportu i Rekreacji Płock Sp. z o.o.
Procedure concluded
Awarded — contract award notice
Award amount
••••••
Result announced
30.09.2026
Contractor awarded the contract
••••••••••••••
To see who was awarded the contract, create a free account. Create a free account →
COUNTRYPOLSKA
AWARD AMOUNT••••••
PUBLISHED30.09.2026
INDUSTRYConstruction work
SUBJECT OF THE CONTRACT
The subject of the contract is the replacement of the surface of the B2 artificial pitch at the Kazimierz Górski Municipal Stadium in Płock. The scope of work includes the dismantling of the old surface and the installation of a new synthetic grass surface (tufted or woven) on a shockpad cushioning mat with a minimum thickness of 10 mm, including infill with quartz sand and EPDM granulate. The pitch area is 8701 m2.…
This is the beginning of the description. The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Construction work) bids can still be submitted in 1 826 procedures — deadlines within 14 days.
This buyer in the last 12 months
Miejski Ośrodek Sportu i Rekreacji Płock Sp. z o.o.: 39 notices.
Most frequent winners: AUDAX RENEWABLES POLSKA SP. Z O.O. (1), Active Line Marcin Taczalski (1), Energa Operator S.A (1).
Most frequent winners: AUDAX RENEWABLES POLSKA SP. Z O.O. (1), Active Line Marcin Taczalski (1), Energa Operator S.A (1).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Create a free account — see who was awarded the contract and for how much
Freemium account: 4 full cards to start · no credit card required