What you will see after registration
Documents to submit
- ✓Bid form — attachment no. 1
- ✓Declaration of non-exclusion
- ✓List of supplies from the last 3 years
- ✓Liability insurance — min. 120 000 €
- ✓Proof of bid bond payment
- ✓Power of attorney, if signed by an agent
AI warnings from documentation
- ❗Bid bond 3 500 € — payment before submission deadline
- ⚠Required 2 references after min. 90 000 €
- ⚠Completion deadline 30 days from signing
- ⚠Mandatory site visit — rejection if missed
- ✓No ISO certificate requirement
Budget and competition
3median number of bids
24%tenders with one bid
- ✓Amount from bid opening for this buyer
- ✓Who won there before and for how much
- ✓Suggested price range based on data
Analysis example — specific values depend on the proceeding
Full card with AI analysis — after free registration.
Basic preview · no login required
Zaprojektowanie i wykonanie remontu wiaduktu zlokalizowanego nad drogą dk 16 w km 290+776 w msc. Ełk (nad drogą lok. 16d, km lok. 3+270)
BZP Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Olsztynie
Procedure concluded
Awarded — contract award notice
Award amount
••••••
Result announced
21.10.2026
Contractor awarded the contract
••••••••••••••
To see who was awarded the contract, create a free account. Create a free account →
COUNTRYPOLSKA
AWARD AMOUNT••••••
PUBLISHED21.10.2026
INDUSTRYConstruction work
SUBJECT OF THE CONTRACT
Design and execution of the renovation of the viaduct over the DK 16 road at km 290+776 in the city of Ełk. The contract covers full services: design documentation (construction/technical design) and the execution of construction works for the renovation of the existing engineering structure.
The rest, participation requirements, documentation, and deadlines — after free registration.
🔒
You are seeing only part of the information because you are not signed in
The full subject description, participation conditions, required documents, deadlines and AI analysis are available after creating a free account.
Create a free account →
Full list, no login required.
Before you leave
Similar tenders closing soon
In this sector (Construction work) bids can still be submitted in 1 200 procedures — deadlines within 14 days.
This buyer in the last 12 months
<span class="utn" title="Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Olsztynie">Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Ols…</span>: 150 notices.
Most frequent winners: STRABAG Sp. z o.o. (6), Budownictwo Drogowe Łukasz Sokołowski (3), Biuro Projektowe DROMAX Daniel Niedźwie… (2).
Most frequent winners: STRABAG Sp. z o.o. (6), Budownictwo Drogowe Łukasz Sokołowski (3), Biuro Projektowe DROMAX Daniel Niedźwie… (2).
Do not miss the next one like this
A daily e-mail with new procedures on this topic — including small-value ones missing from the national bulletin.
Create a free account and set an alert
Create a free account — see who was awarded the contract and for how much
Freemium account: 4 full cards to start · no credit card required